Your Location:Home > News  > How to repair the roller of the impact crusher

How to repair the roller of the impact crusher

The impact crusher uses rollers to crush and break materials, so it plays an important role in the equipment. In the operation of the equipment, if the feed is not strictly controlled, it is very likely to be this part If damage occurs, it must be resolved in time after the problem is discovered, so as not to affect production efficiency. The following is the repair method of this equipment roller to share with you:  
 
1. First, make preparations before repair, clean up oil, dust, broken pieces, and rust, check the shape and position of each main working part and assembly part, and make a record. Temporarily block the part of the fallen tooth to reduce the impact of the failure.

2. When the impact crusher's roller shaft is lightly worn, you can choose to repair the roller teeth. The roller teeth are bottomed, filled, and then dried. After heat preservation for 1 hour, vertical welding is used for symmetrical deposition. After layering, use a hammer to hammer and remove the stress. The surface layer of the roller teeth is insulated for 1 hour, and the pre-welded part is preheated. The preheating temperature is 150°C. The welding rod is 4mm in diameter and the welding current is 200A. Two people use horizontal symmetrical welding at the same time, stacking from bottom to *. . Cover with as*os cloth immediately after welding for heat preservation and slow cooling.

3. If there is serious wear or leakage, the roller shaft and the roller teeth can be welded together. The two ends of the roller shaft are erected on two rollers, and the root of the roller teeth is processed with a carbon arc gouging and fixed on the single side V-shaped groove. The corresponding position of the roller shaft. After each row is welded, the roller is rotated and the next row is welded until the welding is completed.

4. After all parts that need welding or surfacing are welded and meet the requirements, machine the spindle bearing and sealing parts to ensure the assembly dimensions of each part, and then assemble according to the technical requirements of the drawings. Note that the assembly should be in accordance with the original The structure is installed in order to prevent the normal operation of the equipment from being affected.



Inquiry >> Please feel free to give your inquiry in the form below. We will reply you in 24 hours.
Your Name :
E-mail: *
Your Tel : (We Suggest You Tell Us Your Telephone Number Which Will Contribute To Our Communication)
Your Country :
Instant Messenger:
Message:

news

  • What is the price of the entire sand production line?1.What is the price of the entire sand production line?
  • What should the mobile stone crusher be used for the first time?2.What should the mobile stone crusher be used for the first time?
  • Brief introduction of the impact crusher maintenance3.Brief introduction of the impact crusher maintenance
  • What is the difference between VSI impact crusher and impact crusher?4.What is the difference between VSI impact crusher and impact crusher?
  • How to Choose the Jaw Crushing Plant?5.How to Choose the Jaw Crushing Plant?
  • Case

    1000TPH Mountain Stone Crushing Plant In Sri Lanka1000TPH Mountain Stone Crushing Plant In Sri Lanka 300TPH Mountain Stone Crushing Plant In Indonesia300TPH Mountain Stone Crushing Plant In Indonesia 200T/H Aggregate Stone Crushing Plant In Philippines200T/H Aggregate Stone Crushing Plant In Philippines Configuration of 250TPH River Stone Crushing PlantConfiguration of 250TPH River Stone Crushing Plant